The St. Croix Chippewa Indians of Wisconsin selected DBS Group as the design-builder for their Flexible Facility Project. This project included designing and constructing the repurposing of their existing 26,000-square-foot, former Tribal Administration facility to use as a community center, education center, and elder center, and for historic preservation.