Blog
After serving as construction manager this summer for infrastructure work (Phase 1) for the Belmont Heights subdivision in Jackson, MN, DBS Group has been tapped to design-build Phase 1a of the development. Phase 1a includes the design and construction of a new, ground-up, three-story, 41-unit market-rate apartment and new, ground-up, two-story, four-unit market-rate townhomes in the subdivision. Construction is scheduled to begin in early September for substantial completion in summer 2025.